Thursday, August 16, 2007

Toward the end, slowly or no heat yet.

I say that but we will probably be in the house in about 2 months--whoohoo!

The wall board taping is mostly done so texturing is next, I think. We still do not have a garage door or heat so that may slow things down a bit.

Why don't we have heat? We have a furnace and the piping to it but a little matter of 50 plus feet to the gas line has stopped us COLD. The short version is that we are waiting for the subcontractor of our local gas utility (aka Mafia NW) to bless us with their presence of a half hour of work to reconnect said pipes through conduit laid so nicely by DB with a means to fish it through. Oh and and the charge will be 1K for this privileged presence. (Note--dripping sarcasm). Oh, and did I mention that they have us scheduled for the 24th---3 weeks after we got the paperwork to them!!!!! Yes, we feel ripped off. Yes, we are bitching. Yes, we need to put on our big girl pants on and get on with it--enough! ( I do feel slightly better getting that in writing.....)